Damages

Fault-based compensation for loss caused by a defect or breach of duty; on construction projects often alongside warranty (sections 1293 et seq., 933a ABGB).

In brief

Unlike fault-independent warranty, damages require fault on the part of the contractor. Compensation covers the loss caused by the defective or delayed performance, including consequential loss flowing from the defect.

For loss to the works themselves, section 933a ABGB first gives the contractor the right to repair. Enforcement is subject to limitation under section 1489 ABGB, generally three years from knowledge of the loss and the person liable.

On construction projects the planner, the executing contractors or the site supervision may be liable depending on the situation. Contributory fault on the client’s side can reduce the claim.

Legal basis

Statutory texts for orientation; the version in force at the relevant time prevails.

This explanation gives a general overview of Austrian law and does not replace advice in an individual case. The specific circumstances of your construction project are always decisive.

Defects, a remuneration dispute, looming litigation?

In construction law, deadlines and evidence decide. Call us directly or send an email, callback within one business day.

Contact

A direct line to the firm.

Address

BRANDAUER Rechtsanwälte GmbH Giselakai 51 5020 Salzburg