The aviation-law classification should be clear before ordering and erecting the crane.
Record the location, maximum height, jib configuration and intended operating period. Then check whether a safety zone or the height criteria in section 85 Aviation Act are relevant.
Do not begin erection until the required permits and any conditions have been clarified.