Construction defect claim check
Warranty or damages for a building defect? Enter handover, discovery and your role to receive an initial, non-binding assessment of which claim comes to the foreground in your case.
BRANDAUER Rechtsanwälte
Salzburg law firm for real estate, construction and corporate law
Every matter is handled by a coordinated team of lawyers, legal staff and specialists. In construction cases we look at contract, evidence, deadlines and commercial consequences together.
When a defect appears on a finished building, two routes are open that complement one another. The warranty under sections 922 to 933 of the Austrian Civil Code (ABGB) ensures that you receive the defect-free work you paid for. The damages claim under section 933a ABGB reaches further and also covers consequential losses, but for that it requires fault on the part of the contractor.
This calculator takes the date of handover and of discovery, your role and the type of problem. From this it follows whether the warranty period is still running and which route comes to the foreground in your case. The result is an initial assessment and does not replace an examination of the individual case.
Warranty or damages?
Enter the key dates of your construction defect. The calculator works out which claim comes to the foreground, whether the warranty period is still running and whether a damages claim should additionally be examined.
Note: This calculator is general guidance on the Austrian legal position and does not replace advice in an individual case. Whether warranty or damages applies depends on fault, the start of the time limit and the evidence, which are often disputed in an individual case. For a binding assessment we recommend an initial consultation (180 euro).
Further topics around construction defects
Warranty or damages for construction defects
The detailed article with a comparison table on the requirements, scope and time limits of the two claims.
Construction damages and liability
The focus page on fault-based compensation for damage and consequential losses on the building.
Construction defects and warranty
The focus page on defects in the building, the remedies and the warranty periods under the ABGB.
Defects, a remuneration dispute, looming litigation?
In construction law, deadlines and evidence decide. Call us directly or send an email, callback within one business day.
A direct line to the firm.
Address
BRANDAUER Rechtsanwälte GmbH Giselakai 51 5020 Salzburg
Phone
+43 662 6280000