A property outside the safety zone follows a separate assessment.
Section 86 LFG applies to aviation obstacles within a safety zone. Sections 85(2) and (3), together with section 91 LFG where applicable, set a separate route outside the zone. Have the actual building height and site assessed under those provisions.[1][2]
A construction crane is a temporary installation with its own practical questions. Our article on construction cranes as aviation obstacles covers that situation.